The PV System is interfaced with the state power utility grid.The Solar power runs the load to the extent possible during day time.If there is a deficit in energy generation.The differential Power / Energy is drawn from the grid. A bidirectional meter will be installed to record the net energy.
Our Price includes the cost of installation. The following components are mandatory components as part of installation.